Happy St Paddy’s Day! We celebrated this weekend with a new backsplash…
Only problem is… this stuff isn’t cheap. We even made a trip to the city where we spent all day at 14 different tile shops, and everything similar was around $20/sf. Because we wanted to cover the entire back wall, we needed around 80 sf. $1600 for tile is not happening. Nor is $1000. I didn’t even want to spend $500. So it was back to the drawing board…
Classic white subway was always in the back of my mind as an option. Half of the kitchens I’ve been drooling over on Pinterest have it…
But that’s the thing, I didn’t want to look like every other kitchen. But then you realize that Pinterest =/= real life, and white subway tile probably won’t ever go out of style, and it’s a very economical option. So I went for it.
Instead of the individual standard 3×6 tiles, we opted for the smaller 2×4’s that come on a sheet—because I thought the smaller scale would add more interest, and they seemed easier to install.
We originally got bids for the labor (tile has always been something we’ve hired out because we’ve never trusted ourselves to do it right)—but the quotes all came back at over $1000, which we did not expect at all. I guess labor is cheaper in Florida? Anyway, with all that we’ve accomplished since owning this house, I was feeling confident and told Brad I thought we should go for it. My dad said he’d help out on the first day so that sealed the deal.
Here’s what we bought from Lowe’s to get the job done:
Tile (80 sf)
Type 1 Mastic (a 3.5 gallon bucket, and we used maybe 2/3 of it)
Grout (Mapei in Warm Gray)
Colored caulk to match the grout
Grout sealer
A 1/4″ notched trowel to spread the mastic
A grout float trowel
A sponge
Spacers
Our family friend let us borrow his wet saw which was a huge lifesaver. We were concerned that we’d need a scoring knife or tile cutter for smaller cuts but it wasn’t necessary at all.
The total for the tile came in at $299 (we have two sheets leftover so we can return them for $7, woohoo) and it was about $110 for materials.
I spent some time researching (thanks everyone for the advice in my last post!) and here are a few helpful tutorials I found:
Armed and ready, we began our journey Saturday morning…
We got a system going—Brad and my dad cut the tiles while I spread the mastic and installed them.
I was so relieved after the first few tiles went in. We could actually do this!
To make sure they properly adhered to the wall and were all level, I nudged each tile in with a rubber mallet.
If there was too much mastic, it would seep through the cracks so I swiped it up with a small screwdriver.
We were so lucky here… the area above the sink fit four rows of tiles perfectly so we didn’t have to make any cuts.
But of course it evened out in other areas, like this one, where there were some small pieces against the window. We also had to leave a gap next to the door, otherwise it wouldn’t be able to open all the way (bad design).
Here’s the other side of the window:
When stacking sheets of tile vertically, it’s important to use your spacers! Even when they go in perfectly if you don’t think you need them—they tend to shift. Often times I would step back and find tiles from earlier that had moved and I had to go back and shove spacers in before the glue dried. Fortunately, mastic gives you a pretty generous window (~30 minutes) for making adjustments. But my advice is don’t skimp on the spacers, they’re good insurance.
At around 4pm on Saturday (after 5.5 hours), we called it a day.
The next morning we were setting up and realized we’d forgot to wipe the mastic off of our starting point, which meant we had to scrape it off so the wall was even and the next sheet of tile would be level.
Don’t forget to clean the mastic off first if you are going to take a long break!
On the second day I got smarter and wore latex gloves. SO much better than having mastic stuck all over your hands and having to scrub it off.
Really, the most difficult part of the whole job is just the physical energy it requires. Cutting and measuring is the easy part—spreading mastic for 5+ hours gets tiring. I’m still slightly sore.
But watching it all come together is oh so worth it.
Finally, we made our way underneath the window and back around to the end.
Actually, the end was the hardest part. Since we made a big loop around the window, the tiles had to meet back up at some point. Making sure the right side matched the left side so that they were perfectly interlocking when they lined back up was a challenge.
We actually didn’t even think about it until it was too late, so the gaps were a little larger than they should have been.
It’s important to note that tiling is an imperfect process. Even from the factory, some gaps were closer to 1/16″ and others were over 1/8″, so I wasn’t going for perfection here.
And when you look at the big picture it’s not really noticeable…
There will be pillows there which should help, and I also have a backup plan if it ends up bugging me (hint: white nail polish).
Walking into the kitchen is like a breath of fresh air now…
It really adds so much.
Oh, and we’ll be trimming out the top and the right edge where it meets the planks with quarter round.
This afternoon I’ll start grouting. The matching caulk was special order and won’t be here for 1-2 more weeks, but we have plenty more to do this week (like build the second bench seat and tile our bar wall!)
More to come in a few days…
In The Night Sky says
I've been watching you kitchen take shape and it really does look wonderful – the subway tile really compliments it. Tiling is time consuming (especially when it covers an entire wall!) but so worth it in the end.
Crystal says
Please, please, please… wear goggles – Brad too. And your dad. And anyone else who might help. It's too awful to contemplate all the work you couldn't see and enjoy if some piece/particle/dusty stuff, etc. ends up in an eye. Don't want to be preachy, but sometimes we don't get do-overs.
And on a lighter note… how's the new kitty and Susie getting along?
Melissa Sabra says
Looks awesome – you guys did a great job! I have kitchen envy over here 🙂
Marcy says
This is amazing! Such great inspiration!
Heidi says
Holy goodness that is a lot of tile! Congratulations! That is really impressive.
https://jax-and-jewels.blogspot.com
Ann says
Wonderful Work!
Katie {Little House of Four} says
Looks great! You can never go wrong with classic subway tile.
Leanne says
This is looking awesome!!
Erin Colburn says
It looks so great! We're finishing up our backslash now, too, so I feel your pain!
Sarah S says
Seriously looks SO good!
Jenna Sue says
Thanks Amy! Do you mean the mastic on the tiles? I just used a cloth and water to wipe it down as I went. Once the mastic dries it needs to be scraped off, I just used a flathead screwdriver since these tiles don't scratch easily.
Amy says
Wow! I'm so impressed. It is all coming together so nicely! How does it clean up? With just a rag & water?
Alexa Cayce says
It looks amazing!
Kristin says
LOVE LOVE LOVE IT!
Brittany K says
Oh my gah! I want your kitchen… its coming together so nicely! love it!!